Ready for Wincanton Show 11-12 Nov

Getting Sturminster ready for the show at Wincanton next weekend, managed to get the Collett running, not sure what I did but runs around the layout and Poole Sidings now with no problems. All the points have been checked on the layout along with the routes and Signals and most of the engines have beenContinue reading “Ready for Wincanton Show 11-12 Nov”

Poole Sidings – June Update

Progress has not been at the speed I would have liked and I’ve been struggling for what seems ages getting the double slips set up. More on that later. The main lines and carriage sidings are now all installed and working, the cement sidings/yard is also in place along with all the points, point motorsContinue reading “Poole Sidings – June Update”